Kohtla-Järve sports and health center
Design of glulam structures for the building, including 34m glulam beams and 30m arched beams. Fire resistance R60.
Structural engineering from principal design stage for glulam and shop drawings by Makespace OÜ in collaboration with Novacon OÜ. Project in collaboration with Zoroaster OÜ and Greygecko engineering OÜ. Modelled in 3D using BIM capable software.
Architects: Zoroaster OÜ
General contractor: Nordecon AS
Year of completion: 2021
Construction stage: